CMMC levels compared: requirements, assessments and affirmations under 32 CFR part 170
| Level | Requirement source | Assessment type | Frequency | Affirmation | Phase-in (32 CFR 170.3) | DFARS contract clause |
|---|---|---|---|---|---|---|
| Level 11 | Requirement sourceThe 15 Level 1 requirements: FAR 52.204-21(b)(1)(i) to (xv)1 | Assessment typeSelf-assessment, results entered in SPRS; no POA&Ms permitted1 | FrequencyAnnually1 | AffirmationRequired with each self-assessment and annually after it, entered in SPRS by a senior Affirming Official1 | Phase-in (32 CFR 170.3)From Phase 1, which begins on the effective date of the 48 CFR part 204 rule: DoD intends to require Level 1 (Self) as a condition of contract award1 | DFARS contract clauseDFARS 252.204-7021, under a rule effective November 10, 2025; until November 9, 2028 used when the program office or requiring activity determines a specific CMMC level is required2 |
| Level 21 | Requirement sourceThe 110 Level 2 requirements; identical to NIST SP 800-171 Revision 21 | Assessment typeSelf-assessment (Level 2 Self) or certification assessment by an authorized or accredited C3PAO (Level 2 C3PAO), as the contract requires1 | FrequencyEvery three years; any POA&M must be closed out within 180 days1 | AffirmationAt each assessment, after POA&M closeout, and annually after a Final status, in SPRS1 | Phase-in (32 CFR 170.3)Phase 1: DoD intends to require Level 2 (Self), and may require Level 2 (C3PAO) instead. Phase 2, one year later: Level 2 (C3PAO) for applicable contracts. Phase 3: Level 2 (C3PAO) for all applicable contracts, including option periods on contracts awarded after the effective date1 | DFARS contract clauseDFARS 252.204-7021; on or after November 10, 2028 used when the program office or requiring activity determines that contractor systems will process, store or transmit FCI or CUI (not for COTS-only purchases), dates kept in Class Deviation 2026-O0025, Revision 3. As of 2026-11-14 that deviation tells contracting officers to remove or revise CMMC requirements under a July 13, 2026 Department of War CIO memorandum suspending the November 2026 Phase 2 transition3 |
| Level 31 | Requirement source24 requirements selected from NIST SP 800-172 (February 2021) with DoD-assigned parameters, listed in table 1 to 170.14(c)(4)1 | Assessment typeCertification assessment by DCMA DIBCAC; a Final Level 2 (C3PAO) status on the same scope is a prerequisite1 | FrequencyEvery three years, with a new Level 2 (C3PAO) assessment also every three years; any POA&M closed out within 180 days1 | AffirmationAt each assessment, after POA&M closeout, and annually after a Final status, in SPRS; the Level 2 (C3PAO) status must also be affirmed annually1 | Phase-in (32 CFR 170.3)Phase 2: at DoD's discretion. Phase 3: DoD intends to require it for all applicable contracts as a condition of award. Phase 4: all applicable contracts, including option periods on contracts awarded before Phase 41 | DFARS contract clauseSame DFARS clause 252.204-7021 and dates; the solicitation provision is 252.204-70252 |
License: CC BY 4.0. Underlying government texts are public domain or under their own terms. Attribute "Moraph Insights" with a link to the page.
Method
The three CMMC levels compared from the eCFR text of 32 CFR part 170 (unchanged since December 16, 2024, as checked on 2026-11-14) and the DFARS final rule in the Federal Register, cross-checked against the current eCFR text of DFARS 204.7504; all opened on 2026-11-13 and re-opened on 2026-11-14. Requirement counts are those stated in the definition of CMMC Security Requirements in 32 CFR 170.4. Phase dates other than those printed in the DFARS rule are not stated, because 170.3 defines them relative to Phase 1. The suspension of the Phase 2 transition is taken from DFARS Class Deviation 2026-O0025, Revision 3 on the Defense Pricing, Contracting, and Acquisition Policy site, opened on 2026-11-14; the CIO memorandum it cites was not opened, and no Phase 2 date is computed.
Omitted
What was left out, and why.
- Level 2 · phase_in (Phase 2 date): The cell gives Phase 2 as one year after Phase 1, as 32 CFR 170.3(e)(2) does, and the class deviation names only a November 2026 Phase 2 transition. The Department of War CIO's CMMC page (dodcio.defense.gov/cmmc/About/, Internet Archive copy captured November 13, 2026) says the Phase II requirements were originally scheduled for November 10, 2026 and were suspended on July 13, 2026; that page is not one of this table's sources, so the date is listed, as suspended, in the 32 CFR part 170 register entry instead.
Notes
- Phase 2 begins one calendar year after Phase 1 starts (32 CFR 170.3(e)(2)). DFARS Class Deviation 2026-O0025, Revision 3, signed September 3, 2026 (digital signature), carries forward a Department of War CIO memorandum of July 13, 2026 that suspends the November 2026 Phase 2 transition and permits Level 1 (Self) or Level 2 (Self) assessments in all procurement requests; the deviation remains in effect until rescinded or incorporated into the FAR, DFARS and DFARS PGI.
- DoD may waive CMMC requirements for a procurement in advance of the solicitation (32 CFR 170.3(c)(2)).
- Status as of 2026-11-14 (eCFR version history): eCFR shows no amendment to 32 CFR part 170 since December 16, 2024, and DFARS 204.7504 unchanged since November 10, 2025.
Sources
- eCFR, Office of the Federal Register and Government Publishing Office. 32 CFR part 170, Cybersecurity Maturity Model Certification (CMMC) Program, sections 170.3, 170.4, 170.14 to 170.18 and 170.22. Checked .
- Department of Defense, Defense Acquisition Regulations System (Federal Register). Defense Federal Acquisition Regulation Supplement: Assessing Contractor Implementation of Cybersecurity Requirements (DFARS Case 2019-D041), 90 FR, document 2025-17359, September 10, 2025. Checked .
- Department of War, Defense Pricing, Contracting, and Acquisition Policy. Class Deviation 2026-O0025, Revision 3: Revolutionary FAR Overhaul Part 40, DFARS Part 240 (memorandum and attachments), signed September 3, 2026 (digital signature). Checked .
How we source and check every fact: Editorial standards · Corrections
Last reviewed .
Spotted an error? Tell us and we will check it and correct the table where needed.